Enable CI/CD

2 jobs for !1 with CrossCompilationSupport in 3 seconds (queued for 32 seconds)
detached

View job dependencies in the pipeline graph!

You can now group jobs in the pipeline graph based on which jobs are configured to run first, if you use the needs: keyword to establish job dependencies in your CI/CD pipelines. Learn how to speed up your pipeline with needs.

Provide feedback
Status Job ID Name Coverage
  Static Analysis
passed #18003
cross
merge_log

00:00:01

failed #18004
cross allowed to fail
merge_whitesp

00:00:01

 
Name Stage Failure
failed
merge_whitesp Static Analysis
No job log

Speed up your pipelines with Needs relationships

Using the needs keyword makes jobs run before their stage is reached. Jobs run as soon as their needs relationships are met, which speeds up your pipelines.

If you add needs to jobs in your pipeline you'll be able to view the needs relationships between jobs in this tab as a Directed Acyclic Graph (DAG).